Ground Trades Xchange - a landscaping forum

Go Back   Ground Trades Xchange - a landscaping forum > Landscape Services > Homeowner Help
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read



Reply
 
LinkBack Thread Tools
  #1 (permalink)  
Old 08-24-2008, 11:01 PM
Acorn
 
Join Date: Aug 2008
USDA Zone 8
Posts: 1
Kieran is on a distinguished road
slope

Hi All,

In advance, thank you for time and advice. I am a homeowner new to installing a patio and we are starting with a whopper. It is 900 square feet, free standing (does not abut the house) and we are planning to use paver brick. Thus far we have dug the patio "pit" 6" deep, placed 3" of crushed stone, tamped it w mechanical tamper, placed landscape fabric and are about to place quarry dust on top (and tamp it of course). We will leave one inch from the top free to place the brick and "techno-sand" (?)(it is something a landscape supplier told me about which is mason sand plus something that binds like cement - said I don't have to water when I place it but at the first rain it will harden like cement). The question I have is how do I plan for the slope. We were planning on sloping away from the house and neighboring property at a raate of 1/8" per foot but inexperience just prevents me from knowing how to place the string to insure that type of slope. In laying the quarry dust I want to pitch the patio correctly. ANy advice on how I do this. Thanks all.
Reply With Quote
  #2 (permalink)  
Old 08-25-2008, 08:21 AM
VoodooChile's Avatar
Moderator
 
Join Date: May 2004
Location: Lake Geneva, WI
USDA Zone 5
Posts: 1,460
VoodooChile will become famous soon enough
This is not a project for a beginner, contractor or homeowner.
Reply With Quote
  #3 (permalink)  
Old 08-25-2008, 11:52 AM
FungusMudGrub's Avatar
Seedling
 
Join Date: May 2005
USDA Zone 5
Posts: 120
FungusMudGrub is on a distinguished road
To get the slope, first you have to establish what is level. Put some wooden stakes around the perimeter of the patio-to-be, mark the stake on the uphill side at a point where you want the finished grade to be, then use a laser level, water level, or string level (least accurate choice) to mark all the other stakes. Now measure the distance between the uphill stake and the downhill stake, do the math, and mark the downhill stake the proper distance below the level line. For example, if the distance is 8 feet, 1/8" x 8' = 1" below the level line. Hope this helps.
__________________
Nothing can ever be made foolproof, because fools are so ingenious.
Reply With Quote
Reply





Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Free Landscaping Magazines
Similar Threads
Thread Thread Starter Forum Replies Last Post
levelling slope TrickyDick Hardscaping 4 07-16-2008 09:48 PM
"Mowable Slope" Garden Variety Hardscaping 12 09-09-2007 08:36 PM
Bluestone pavers on slope rockman Hardscaping 9 08-31-2005 08:37 PM
Slope Lazers Bill Schwab Landscaping Tools and Equipment 7 07-06-2004 11:56 PM
Any tips for driving an Mini-X down a steep slope? Stonehenge Landscaping Tools and Equipment 7 09-27-2003 01:02 PM

All times are GMT -4. The time now is 11:40 AM.


Powered by vBulletin®
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
Copyright ©2003-2009 Ground Trades Xchange, LLC