We are almost done the pink walk I have been working on between showers the last week. I put the last pieces of flagging in today. It looks awesome.
I will be going back next week and cleaning the stone dust from the joints with a water jet and replacing it with some polymeric sand. I don't like the dark joints against the rose stone and every time one pebble of stonedust gets on the stone it becomes the focal point of the walk.
Now the bad news
We used the spigot on the front of the house to wash the walk off. My guys like to leave spigots turned on because it takes too long to walk over and turn them off. I'm the owner and accept responsibility for this. Apparently this faucet had a pretty huge leak in it and we didn't realize it until we spotted the stream running FROM THE GARAGE.
After a trip back to the shop for a vacuum, fan, and some sponges we cleaned up the mess in the basement and hung the carpets over the deck. I called the homeowner at work and he seemed OK about the incident, but I'd like him to get home and check out the basement first.
The moral of the story:
TURN THE HOSE OFF IMMEDIATELY WHEN YOU ARE DONE USING IT.
Trust me, we'll be doing that from now on!