Ground Trades Xchange - a landscaping forum

Go Back   Ground Trades Xchange - a landscaping forum > Landscape Services > Hardscaping
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read



Reply
 
LinkBack Thread Tools
  #1 (permalink)  
Old 06-28-2007, 11:55 PM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
Belgium block laid flat

I'm bidding a job that includes installing a belgium block border along a driveway. The problem is we've never installed it this way before and I'm not sure how to gp about it. Anyone done this before?
Reply With Quote
  #2 (permalink)  
Old 06-29-2007, 04:42 PM
Matt Kulp's Avatar
Gold Oak Member
 
Join Date: Dec 2005
Location: South East Pa
USDA Zone 7
Posts: 391
Matt Kulp is on a distinguished road
Are you dry laying or setting in concrete? New drive or existing?

I would try and go the concrete method, you will lay the block 10 times faster and it will be strong enough to take the occasional hit by a car.
Attached Thumbnails
belgium-block-laid-flat-haines-job-003.jpg  
__________________
Matt
Reply With Quote
  #3 (permalink)  
Old 06-29-2007, 07:11 PM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
I would definitely set them in concrete but wasn't sure how deep. How much of the block did you leave exposed for asphalt, 2"?
__________________
North Jersey Landscaping
Reply With Quote
  #4 (permalink)  
Old 06-29-2007, 08:57 PM
TrickyDick's Avatar
5 Gallon Tree
 
Join Date: Mar 2006
Location: Rhode Island
USDA Zone 7
Posts: 539
TrickyDick is an unknown quantity at this point
Asphalt's usually 3". Don't know if it varies much though. You would want to talk to the paver anyway.
Reply With Quote
  #5 (permalink)  
Old 06-30-2007, 12:02 AM
Matt Kulp's Avatar
Gold Oak Member
 
Join Date: Dec 2005
Location: South East Pa
USDA Zone 7
Posts: 391
Matt Kulp is on a distinguished road
Exposure depends on preference. The job above had a 4" exposure. The trick to installing in concrete is to have the concrete wet enough to just push the block in with no effort.
This will also allow you to pour more concrete and install before it starts to set up. We usually use rebar in the concrete, as well as expansion joint every 12-14'. If the paving co. is doing a new drive, they will probably do a 2" binder and then 1" top coat. Just make sure the grades are right for the curbing and check there base before the asphalt goes in. I have worked on a couple of jobs that the pavers were not interested in details and the proper exposure was not carried through the whole drive. You should be able to pour and install 100' per day with two guys and that would include excavation, prep, pour and install. Pointing averaged about 18' per man hour.

Hope this helps.
__________________
Matt
Reply With Quote
  #6 (permalink)  
Old 06-30-2007, 08:31 AM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
Thanks Matt, I appreciate the help. How much concrete do you put under the block? I'm thinking around 6" since there is a good chance of car tires running on it.
__________________
North Jersey Landscaping
Reply With Quote
  #7 (permalink)  
Old 06-30-2007, 09:36 AM
Squizzy Taylor's Avatar
Seedling
 
Join Date: Jan 2006
USDA
Posts: 148
Squizzy Taylor is an unknown quantity at this point
Quote:
Originally posted by HRLand
Thanks Matt, I appreciate the help. How much concrete do you put under the block? I'm thinking around 6" since there is a good chance of car tires running on it.
We typically pour a 4 or 6" strip footer with mesh/reo and then lay the blocks on about 3/4 to 1" of mortar. This allows you to tap the blocks around with a mallet and level perfect. BTW, if the paving is something that is likely to expand or contract I make the pavement guys run an expansion strip around the blocks...just to be sure.

I know the strip footer is overkill on what is a single course wall (in effect) but it all depends on the soil type...especially if its clay that heaves in summer. Often when we are working in good clean deep sand we can just get away with 2" of mortar under the edging.
__________________
Regards from West Aus
Squizzy
www.costone.com.au

Three grand essentials to happiness in this life are something to do, something to love, and something to hope for.
Reply With Quote
  #8 (permalink)  
Old 06-30-2007, 12:04 PM
Matt Kulp's Avatar
Gold Oak Member
 
Join Date: Dec 2005
Location: South East Pa
USDA Zone 7
Posts: 391
Matt Kulp is on a distinguished road
We usually only pour 4", 6" max, but it will also depend on what kind of grade you have to work with. Squizzy's method of mortar is a good way to do it, but we just hang strings and push the block into the concrete. The key is having the concrete wet enough. I would assume that you are planning on 4-6" of 3/4 clean or comparable clean stone for your base?

Also, just a tip, but make sure you either have the customer survey for the drive if it is new. Or, have the paving company come in and stake out the drive with grade heights. You do not want to be responsible for guessing the height and outline of the drive. We did a job for a builder once that did not want to pay a surveyor, so he just went and painted lines and told us to follow the grade of the existing slope. Well... we did just that and the engineer made the builder rip out 300' of poured curbing and replace. Luckily we had the exclusion in our contract stating the builder was responsible for the layout and the surveying. It ended up being a nice change order, but it was sad seeing all that work and block go to waste.
__________________
Matt
Reply With Quote
  #9 (permalink)  
Old 07-01-2007, 11:10 AM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
Thanks again. We are working with the paving contractor who is a good friend of mine. He'll excavate the driveway and set the grade so we'll just need to dig the extra depth along the edges for our border. I don't think we'll use a footer. The 6" of concrete over 4" of clean stone should work fine and make setting the block easy since there is such a big difference in thickness of the blocks. Now I need to figure out how the homeowner is going to get in and out while we're there. There's close to 1000 feet to install.
__________________
North Jersey Landscaping
Reply With Quote
  #10 (permalink)  
Old 07-01-2007, 11:10 AM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
Thanks again. We are working with the paving contractor who is a good friend of mine. He'll excavate the driveway and set the grade so we'll just need to dig the extra depth along the edges for our border. I don't think we'll use a footer. The 6" of concrete over 4" of clean stone should work fine and make setting the block easy since there is such a big difference in thickness of the blocks. Now I need to figure out how the homeowner is going to get in and out while we're there. There's close to 1000 feet to install.
__________________
North Jersey Landscaping
Reply With Quote
  #11 (permalink)  
Old 07-23-2007, 09:12 AM
Gold Oak Member
 
Join Date: Oct 2003
USDA Zone 6
Posts: 455
HRLand is an unknown quantity at this point
Now we're discussing going with a paver border instead of the block. What do you think about setting them the same way. They want to go with techo-bloc olympia, a 3.125" paver.
__________________
North Jersey Landscaping
Reply With Quote
  #12 (permalink)  
Old 07-23-2007, 09:22 AM
Matt Kulp's Avatar
Gold Oak Member
 
Join Date: Dec 2005
Location: South East Pa
USDA Zone 7
Posts: 391
Matt Kulp is on a distinguished road
I would go with the same method for best results. But, if you are going for the pavers being flush with the pavement you could just install as per vehicular application specs and pave up to them. The second method would be much more cost effective if they are trying to shave cost's. We normally just lay restraint on both sides and let the black top be installed right over top of the restraint.
__________________
Matt
Reply With Quote
Reply


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
SRW pillars vs. wet laid pillars PSUscaper Hardscaping 7 07-24-2006 09:51 AM
Poured wall vs. Block wall cutntrim Hardscaping 2 03-23-2005 05:49 PM
Opinions on Allan Block daveb Hardscaping 29 02-11-2005 08:29 AM
Steps - Pedestal or not? Stonehenge Hardscaping 30 10-28-2003 12:45 AM
need help from a block head agla Hardscaping 4 06-19-2003 06:43 AM

All times are GMT -4. The time now is 12:59 PM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
Copyright ©2003-2007 Ground Trades Xchange, LLC