|
AZTLANLC, I have to say I'm impressed with your grasp of English. After only 9 years of being exposed to it you use it better than many who are born and raised here. If this is an indication of your learning abilities, you are bound to be successful in business.
I put my edging down first, I use Snap-Edge exclusively. Then I use 3/4" conduit (1"od) as a guage for the sand. After laying the body of the walk or patio, I use a neat little tool I got from Pave Tech to mark the bricks for cutting. You set the tool to the width of your soldier course and it then rides on the snap-edge to mark the pavers for your soldiers. It has sped up my cutting by at least 50%.
|