what ever the house move the pad moves. yes the footings are attached to the pad we pour it all together. since we switch to that method and doing it for almost 5 years now and installing over 300 stoops per year we have only 1-2 stoop that need a little something to them, and that usually only take 1 guy 15 min. to adjust.

i do agree with your comment on moisture underneath the pavers. but it is extremely less that only sand and there is no wash out ether.