|
The existing base is not cracked, just topped with a bunch of crap.
Considering the inaccessibility to this area, replacing the base is not an option dealing with our budget. I don't think I would replace it anyway if access was easy. Once we remove all the toppings, we have quite the solid base, if not flat. New mortar would have to be 1 to 4" thick. Should that in itself be a concern?
(PSU - thanks for your frank guidance)
|