|
I will sub out my excavation on anything that is going to require hauling away more than about 5 yards of material. Although I am competant with machinery (and I love running it) I find it is usually faster and cheaper to sub it out to the guys that have the machinery, trucks and dump site for spoils. I have several trusted subs that just need to have the area marked out. I like to install my own base but I will quite often have them do this also, while I am there.
__________________
Life should NOT be a journey to the grave with the intention of arriving safely in an attractive and well preserved body, but rather to skid in sideways - Beer in one hand - Nacho's in the other - body thoroughly used up, totally worn out and screaming : Woo Hoo, what a ride!
|