View Single Post
  #2 (permalink)  
Old 11-14-2006, 07:07 PM
Paul Paul is offline
Ranger
 
Join Date: Feb 2003
Location: Chicago
USDA Zone 5
Posts: 1,558
Paul is on a distinguished road
You need to switch and install a concrete base and install the tubing in it. The concrete will support the tubing and the vehicle loads. The prep also includes a 2" HD foam layer under the concrete, this prevents the heat and cold from penetrating above and below it.
__________________
Reply With Quote