Thanks Stonehenge.
The area was graded last year (August/September time frame) and the yard material is pretty much all clay.
I had the area excavated and had the base added this weekend.
It rained like mad on Sunday evening so I was unable to spread the piles in the pic above.
I will have the pile of material you see removed and will compact the existing material (about 4-5 inches) with a large compactor as you suggest, then re-add the material you see in piles and recompact with the same compactor.
Thanks for the constructive critisism/advice.
- Mike
|