|
we selected a 18'' as well as a 30'' bucket
and a hydraulic thumb and quick coupler for the buckets.
we have a demo machine with a 36'' bucket on it, the machine does surprisingly well with the big bucket, but the 30 will be more useful for more jobs. and the 18'' is for footings. Not our wall footings, but on construction sites, some of our contractor customers have expressed interest in having us dig their footers, we are looking into it and we will use the smaller bucket for stumping.
__________________
We do it right the first time!
|