|
The difference is when I work on a bid I don't have to figure out my time the program does it for me, it draws off of a data base that has my material costs figured in along with labor hrs, equipment hrs. So as I measure out the area for a paver walk way, it adds in the waste along with excavation, gravel, sand, pavers, edging, nails, and man hrs for each job. It's not meant to be a proposal but a working tool that you can refine depending on site conditions, profit, or how little or much equipment can be used on the job.
|