|
We have done a few installs like this, only differance is we like to use 3/8" ground rods, Less sand is used (not that much is used) and we have better control on water holding in the sand. because these areas are typically small areas (under 300 sq ft) and conected to pavment we have to watch for trip hazards.
__________________
|